Skip to content
EN ▾

Technical office · Tendering · Cost

Every item we measure has data behind it.

A data-backed technical office: produced on our own software, delivered under expert review. Cost estimation, BOQ, FIDIC interim payments and claims. We do not subcontract on site.

G3 Grup
18 Years
3,000+ Projects supported
426 Catalogued references
378 EKAP verified
298 With tender no
308,013 Rate memory rows

From query letter to delivery

  1. Query / brief

    The employer's letter or the tender documents reach us.

  2. Free preliminary review

    Scope, time and risk are set out. Feasibility is stated plainly.

  3. Production

    Quantities, rate analyses, proformas and minutes produced on our own software.

  4. Expert check

    Item codes, rate periods and totals are checked line by line.

  5. EKAP-ready delivery

    An ordered PDF set, ready for the employer's review.

Three ways of working

Single job

Single tender support

One tender or one query letter, handled end to end.

Ongoing

Corporate technical office

Acting as your technical office on a continuing basis.

Large scale

Large scale and international

Multi-discipline projects, FIDIC and cost estimation work.

What we do

Tender and Bid Preparation

The process — the whole bid file from notice day to contract; progress schedule, tender annexes, and the ALT defence if a query arrives.

Abnormally Low Tender Justification

Quantities, rate analyses, proformas and statutory minutes — an EKAP-ready defence file.

Quantity Take-off and Cost Estimate

The measurement — a one-off deliverable; civil, electrical and mechanical take-offs priced with current public rates.

Interim Valuations — Preparation and Review

We either prepare the interim valuation or review it for the other side; subcontractor applications included.

Final Account — Preparation and Review

Final account file, comparative bill of quantities and variation orders — prepared or reviewed.

Contract and Cost Management

Contract review, claim structuring, cost tracking and variance reporting.

Project Management and Consultancy

Client-side technical office set-up and process management. No site subcontracting.

Unit Rates and Analysis

Rate build-ups for public, composite and bespoke items; rate period tracked.

Public Procurement Appeals

Technical file for complaint, appeal and corrective action procedures.

Technical Specifications

Civil, electrical and mechanical general specifications; room data schedules.

Measurement Records and As-Built

Laser measurement on site, measurement drawings, panoramic records, as-built drawings.

Piyasa Araştırması ve Tedarik

Selected work

İKN 2012/8833

Sincan–Ankara–Kayaş Line (Başkentray)

Abnormally low tender defence through six Public Procurement Authority corrective decisions and a court process. Won.

442 milyon TL · current value ≈ 13,00 milyar TL

EKAP verified

İKN 2024/1083711

Ovit Tunnels — Electromechanical and SCADA

Rate analyses and defence for tunnel electrical, electromechanical and SCADA automation works.

437,5 milyon TL · current value ≈ 670,8 milyon TL

EKAP verified

Karbala Refinery, Iraq

Quantity take-off and bid file in English for refinery infrastructure works.

EKAP verified

Dr. Lütfi Kırdar Kartal Training and Research Hospital

Architectural, structural and electromechanical quantity take-off and costing across all disciplines.

323.000 m²

Current values are the indexed equivalent of the tender price — period: 2026-06 · TÜİK İnşaat Maliyet Endeksi (2015=100)