Skip to content

QS / TR · EN · AR

Technical office · Tendering · Cost

We know both sides of the coin.

From public investments to international construction contracts, we manage the cost, contract, and entitlement balance of projects to world-class standards. Every technical-office dossier is engineered with transparent data built to pass the most rigorous independent audits, conducted under strict confidentiality and engineering discipline.

For employers, authorities and investors (Client / SPV)

  • Tender dossiers, specifications & contract drafting
  • Cost estimating, budgeting & pre-contract QS
  • Independent interim audit & quantity verification
  • Contract administration & commercial advisory

For contractors and EPC consortia (Contractor / EPC)

  • Bid preparation, detailed BOQ & take-off
  • Rate breakdown & abnormal price justification
  • Interim valuations, variations & final accounts
  • FIDIC contractual claims & extension of time

ETHICAL PLEDGE

We never represent both sides on the same contract — and on any given tender we serve only one bidder or contractor.

≈ ₺28.3bn of work at today's values, computed across 50 projects

G3 Grup G3 Grup PROJECT · COST · CONTRACTS
39°55′N 32°51′E · ANKARA
10 INTERNATIONAL PROJECTS
Iraq · Russia · Kazakhstan · Turkmenistan · Georgia · Ukraine ↗
639Projects in portfolio
327Client organisations
10Sectors
16Service lines
20Years of practice
3,000+Assignments supported
10International projects

Services ready to engage

Professional services catalogue

Access project, cost, contract and technical-office capacity without expanding your permanent team. Engage us for one project, time-based technical-office support or ongoing consultancy.

G3-P01

Per project

A team for one job

Set up for a single tender or project and closed when it ends — take-off, bid file, abnormally low tender justification, whichever is needed.

Per job · defined scopeQuoted by scope
G3-P02

Technical office support

Part-time or full-time

We act as your technical office: payment applications, quantity checks, final accounts and the works programme run with us.

Weekly · monthlyQuoted by scope
G3-P03

Enterprise

Project consultancy

Multi-project portfolios, consultancy on the employer's behalf, FIDIC contracts and overseas work.

Monthly · for the programmeQuoted by scope
G3-P04

Flexible use

Prepaid service credits

Pre-purchase service credits for recurring work. Scope and credit cost are stated before each assignment; approved credits are deducted only after delivery.

Prepaid · use as neededQuoted by package size

G3 / SELECTED

Your quote basket

You have not selected a product yet.

Request a quote for these products

SELECTED WORK

Selected work

REF—01

Menemen–Aliağa–Çandarlı Motorway (BOT)

Subcontract agreements, quantities, interim payments, final accounts and cost control for motorway superstructure and precast-girder works.

78 km motorway · 117.8 km with links · 10 viaducts
REF—02

MaviBahçe Shopping Centre, İzmir

Quantity take-off and interim/final payment reviews across structural, landscape, waterproofing, electrical and mechanical works.

250,000 m² · İzmir · 2016
REF—03

Gebze–Orhangazi–İzmir Motorway (BOT) — Section 1

Subcontractor payments, unit rates and final accounts for the first section of the motorway associated with Osmangazi Bridge.

9 km · 185,000 m² reinforced earth · 48 structures
REF—04

Sincan–Ankara–Kayaş Line (Başkentray)

Quantity take-off and abnormally low tender defence supporting a file that continued through six corrective-action decisions and court proceedings.

Tender 2012/8833 · TRY 442 million · PPA 2015/UY.II-12
REF—05

Dr. Lütfi Kırdar Kartal Training and Research Hospital

Prequalification, English tender documents, four-discipline quantity take-off and final pricing under World Bank procurement rules.

323,000 m² · EIB-WB1-YAPIM-03
REF—06

Ovit Tunnels — Electromechanical and SCADA

Quantity take-off, special-rate analyses and abnormally low tender defence for electrical, electromechanical and SCADA systems across the 14 km twin-tube Ovit crossing at 2,640 m elevation.

14 km twin tube · Tender 2024/1083711 · TRY 437.5 million
REF—07

Batman Right-Bank Irrigation — Section 2

Quantity take-off, abnormally low tender defence and procurement appeal for the second section designed to irrigate 118,000 decares by gravity from Batman Dam reservoir.

118,000 decares · Tender 2016/327623 · TRY 63.25 million

TRACK RECORD

Authorities in our reference projects

Public authorities responsible for the works represented in our reference files.

BOTAŞ Boru Hatları ile Petrol Taşıma A.Ş.General Directorate of Highways (KGM)State Hydraulic Works (DSİ)TCDD TransportMinistry of National DefenceMinistry of HealthEÜAŞBursa Metropolitan MunicipalityÇevre, Şehircilik ve İklim Değişikliği Bakanlığıİstanbul Büyükşehir BelediyesiKocaeli Büyükşehir Belediyesiİller Bankası (İLBANK)TEDAŞAltyapı Yatırımları Genel Müdürlüğü (AYGM)Vakıflar Genel MüdürlüğüPTTOrman Genel MüdürlüğüİSKİİzmir Büyükşehir BelediyesiTOKİMillî Eğitim BakanlığıDHMİTEİAŞEmniyet Genel MüdürlüğüAdalet Bakanlığıİçişleri Bakanlığı (Valilik / YİKOB)Gençlik ve Spor BakanlığıOrta Doğu Teknik ÜniversitesiÇukurova ÜniversitesiMKETürkiye Şeker FabrikalarıAydın Büyükşehir Belediyesi

TRACK RECORD

Companies we have worked with

Mastro YapıSiemensIC İçtaşKalyonAstaldiPORRFernasKırturFavori KuyumculukGAD ArchitectureÜnsal MimarlıkÜNSAL MİMARLIK AŞ.Delsan AsfaltlamaOflaz Şirketler GrubuDeFactoOrtanaKaya IslahıKardelen PeyzajGökçenay İnşaatNas İnşaatÖzver İnşaatMetnas GroupEmay Yol YapıMETAGSavronikNafia İnşaatArpacı İnşaatÖmürlü İnşaatÖMÜRLÜ İNŞAATPolat Yol YapıProyol Asfalt

Send us your project

We do not quote without seeing the scope. Send your documents; we review them free of charge and set the scope and the price with you.

Upload your documents · free review 15-min call on WhatsApp