Measurement records and as-built drawings

The measurement record is where work turns into a number. Work that was never measured and drawn on site cannot be defended in the final account — there is no document left behind the payment line.

Measurement records are usually produced inside an interim payment or final account file; here they are taken on their own — we deliver the measurement, the drawings and the as-built set, and you run the account. For the full file: Interim payments · Final accounts.

Scope

  • Measurement record drawings — a detailed drawing for each work item, checked, with quantities taken from it.
  • On-site measurement — precise laser measurement at the place of work.
  • Panoramic photography — a visual record of the work as built.
  • As-built — preparation of end-of-works drawings.
  • Surveys — branch surveys and concept architectural drawings.

Where we have done it

Sinpaş Ankara Güneypark (blocks A-F-O and 45C–48C), Tuzla MESA Blocks (C-D-F-G), DeFacto retail branches and bank concept branches.

What is different

Measurement, photographs and drawings are kept in one file. A payment line and its measurement sheet open side by side — the discussion is never "was it built", only "by which measurement".

Request a free preliminary review

Send us your project

We do not quote without seeing the scope. Send your documents; we review them free of charge and set the scope and the price with you.

Upload your documents · free review 15-min call on WhatsApp